Skip to content
01Project · HMO Conversions
01 / 07
HMO Conversions · Stoke Student Quarter, Stoke-on-Trent

Student HMO refurb · Stoke Student Quarter (Ed Dovison's second build with HYPE)

8-week HMO refurb a few doors down from the Staffs Uni College Road campus. Tired existing HMO modernised for the en-suite generation: and let to four students before the paint was dry.

↳ 02 Snapshot
02Project · Snapshot
02 / 07

Project · Snapshot

The shape of the build in numbers.

Ed Dovison's second student HMO with HYPE, directly next door to the first. The property had fallen out of favour with Staffs Uni students despite being a few doors from the College Road campus. The problem: dated shared-bathroom layout that today's student tenant pool won't pay for any more. The fix: modernise the layout, add en-suites where the floor plan allowed, refresh the finish. Eight weeks. Four Staffs Uni students locked in before the build had even closed snagging. Final video walks HMO fire regs for open-plan kitchens, useful technical content for any investor planning the same refurb.

8 wksTotal refurb programme
2ndBuild with Ed Dovison (next door to the first)
En-suiteSpec lifted to match current student demand
Pre-let4 Staffs Uni students locked in before handover
↳ 03 The story
03Project · The Story
03 / 07

Project · The Story

How the build actually ran.

The same three questions we ask every project: what they bought, what we did, what changed. Honest. Specific. No marketing fluff.

CHAPTER01

What they bought

An existing student HMO in Stoke Student Quarter, a few doors down from the College Road campus at Staffordshire University. On paper the location was perfect. In practice, the property had fallen out of favour with the student tenant pool, it had become a little jaded.

This is the moment every HMO portfolio owner has to face honestly: properties become dated and lose their appeal. What was in vogue ten years ago doesn't cut it in today's market. Once upon a time, shared bathrooms were more than acceptable for student tenancies. Now, students expect en-suites, and the HMOs that don't offer them lose share to the ones that do.

The owner, Ed Dovison, knew exactly what needed doing. He'd already done his first student HMO refurb with HYPE next door.

CHAPTER02

What we did

Eight-week refurbishment programme. Internal layout adjusted to support en-suites where the floor plan allowed (some shared bathroom configurations stayed where the room geometry didn't support an en-suite cleanly). Modern finish throughout, flooring, plaster, decoration, fixtures, fittings all stepped up to today's student-rental standard.

Notable detail covered in the final HypeTV video: HMO fire regulations for open-plan kitchens. If you're putting an open-plan kitchen in a student HMO, the licensing and fire-safety configuration changes materially, it's not the same as a closed-off kitchen, and the build needs the right strategy from the front. Worth watching if you're considering a similar refurb on your own HMO.

CHAPTER03

What changed

Tired student HMO to current-spec student HMO. The refurbishment paid back instantly: four Staffs Uni students snapped the property up before it was even on the market properly. The repeat-investor model with Ed Dovison is now two properties deep: same firm, same playbook, same tenant outcome, two consecutive properties. That's the kind of compounding relationship that makes student HMO portfolio work commercially scalable.

↳ 04 The build, stage by stage
04Project · Stages
04 / 07

HMO Conversions · Stoke Student Quarter, Stoke-on-Trent

From back-to-brick to handover.

Ed Dovison's second student HMO with HYPE, directly next door to the first. The property had fallen out of favour with Staffs Uni students despite being a few doors from the College Road campus. The problem: dated shared-bathroom layout that today's student tenant pool won't pay for any more. The fix: modernise the layout, add en-suites where the floor plan allowed, refresh the finish. Eight weeks. Four Staffs Uni students locked in before the build had even closed snagging. Final video walks HMO fire regs for open-plan kitchens, useful technical content for any investor planning the same refurb.

Stage 01 / 02Before

Tired. Dated. Losing share to newer HMOs.

Twelve photographs of the property as Ed brought it to HYPE. Solid building, decent layout, good location next to the campus, but the finish had aged, the bathroom configuration didn't match what student tenants now expect, and the lettings agent was struggling to fill it at the rate the building could command.

The before set is useful for any HMO portfolio owner looking at their own tired stock and trying to decide whether refurb or sell-and-replace is the better commercial move. In most cases, refurb wins the maths, provided the location and bones are right.

12 images

Before · exterior
Before · hallway
Before · kitchen as found
Before · communal living space
Before · student bedroom (tired)
Before · second bedroom
Before · third bedroom
Before · fourth bedroom
Before · shared bathroom
Before · second bathroom area
Before · staircase
Before · overall starting condition
Stage 02 / 02Finished

Refurb complete · let in days.

Fifteen photographs of the HMO at handover. Modern finish, en-suite provision lifted to match current student demand, communal kitchen brought up to spec, shared spaces properly dressed.

The agent put the property on the market and it was snapped up almost immediately: four Staffs Uni students locked in before the build had fully closed snagging. The eight-week programme + immediate let outcome is the proof point Ed needed to confirm the refurb model works on his other tired stock too.

The final HypeTV video on this build walks HMO fire regs for open-plan kitchens specifically. Worth watching if your HMO design includes one.

15 images

Finished · refurbed kitchen
Finished · kitchen detail
Finished · communal living refurbished
Finished · student bedroom modern spec
Finished · second bedroom
Finished · third bedroom
Finished · fourth bedroom
Finished · en-suite finished
Finished · second en-suite
Finished · shared bathroom refurbed
Finished · hallway + corridor
Finished · staircase refreshed
Finished · flooring transition
Finished · fire-rated doors in situ
Finished · ready for student tenants
↳ 05 Client word
06Project · On Camera
06 / 07

On camera · Watch the build

On camera.

Every HYPE build is documented on camera. The videos from this project sit at the top. Below them: three of John’s most-watched videos from HypeTV.

From this build

More from HypeTV

↳ 07 Next step
07Project · Next Step
07 / 07

Get in touch. Honest answer. No hard sell.

A quick call with the team to see if HYPE is the right contractor for your build. If we are not the right fit, we refer you to a builder we trust.

This job sits in

HMO conversions
↳ Top