New EPC regulations in 2028: the landlord guide.

The minimum EPC rating for rental properties is expected to jump to C in 2028. Around 60% of current UK rental stock fails that bar today. Here is what the rules say, what they cost, and how to bring a property, or a portfolio, up before the deadline.

↳ 02 The guide
02Article · The Long Read
02 / 03

The brief

The original plan was for new tenancies to need EPC C from 2025 and existing tenancies from 2028. The timeline has been pushed back at least once already and rules may change again before the deadline lands. Any landlord who has not yet started planning for EPC C is going to be making decisions under time pressure they could have avoided. This guide covers the substantive work that gets a property from D or below up to C.

CProposed new minimum rating
60%Current rental stock failing
U-0.18Target roof U-value
CHAPTER01

What the new EPC regulations state

From the proposed 2028 implementation date (subject to confirmation; the date has already moved once), no rental property in England or Wales would be lettable, to a new tenant or an existing one, unless it achieves a minimum EPC rating of C. The current minimum has been E since 2020. The jump from E to C is significant: an E-rated property typically needs work across insulation, glazing, and heating to make the leap. If confirmed, the penalty for non-compliance would be the property cannot be let, which for a portfolio landlord is an existential risk.

CHAPTER02

How to achieve an EPC C rating

There is no single magic intervention. EPC ratings are computed across the entire building envelope, heating system, hot water system, and lighting. The five interventions that typically deliver the biggest jump on a Victorian terrace: loft insulation to 300mm (U-value below 0.18), cavity wall insulation if not already done, replacement of single-glazed windows with double-glazing, condensing boiler replacement, and full LED lighting. For solid-wall properties, internal wall insulation is the largest single move: and the biggest commitment.

There is no single magic intervention. The jump from D to C requires work across the entire envelope.

CHAPTER03

Where landlords go wrong

Two patterns we see repeatedly. First, landlords run the upgrade themselves in piecemeal fashion, never quite achieving the rating jump because each individual upgrade only moves the EPC by 5-10 points. Second, landlords go for the cheapest contractor and discover the assessor reports the work doesn't actually qualify under the assessment criteria. Both end up costing more than getting it done properly first time.

CHAPTER04

When to start

Now, if you can. The date has moved before and may move again, but the work is the same whenever it lands, and contractors get busier as any deadline approaches. A landlord starting the upgrade programme in 2026 has flexibility on contractor choice and pricing. A landlord starting in late 2027 will pay a panic premium and may not finish on time.

↳ 03 Start your build
12Tell me about your build · Resonance
12 / 12

For the right build only

Build it right.
Build it HYPE.

We take on substantial building work across Stoke-on-Trent and the Midlands: extensions, conversions, full refurbishments, commercial works and repairs after fire, flood or damage. Properly scoped projects, not odd jobs or reactive maintenance.

We're VAT registered, so on smaller jobs a non-VAT builder will always undercut us. That's just the maths. Our work pays off where doing it properly matters more than the cheapest quote.

If that sounds like your project, tell us what you've got. We'll tell you straight whether we're right for it, and if we're not, we'll say so. Either way, we wish you all the best x.

↳ Speak to the team+44 1782 930 043Mon–Fri · 9am–5pm · Sat–Sun · Closed