Refurbishment · Stoke-on-Trent

Buy-to-let refurbishment in Stoke-on-Trent

A tired two-bed terrace taken from somebody else’s decorating taste to a clean, rewired, replastered rental in one run of work.

↳ 02 Snapshot
02Project · Snapshot
02 / 07

Project · Snapshot

The shape of the build in numbers.

A buy to let refurbishment in Stoke-on-Trent, taken on for a landlord who wanted the property turned round and let rather than lived in. Full strip-out, rewire, replaster, new kitchen and boiler, then decorated and carpeted throughout. The kind of property refurbishment that decides whether a buy-to-let works as an investment or becomes a running repair job.

2-bedMid-terrace
FullRewire
Back to brickWhere it was needed
WoodwormFound on strip-out
↳ 03 The story
03Project · The Story
03 / 07

Project · The Story

How the build actually ran.

The same three questions we ask every project: what they bought, what we did, what changed. Honest. Specific. No marketing fluff.

CHAPTER01

What they bought

A two-bedroom terrace in Stoke-on-Trent that had been decorated hard by whoever lived in it last. A red lounge with a fake brick chimney breast, brick-effect paper in the back room, a blue geometric feature wall painted straight onto plaster, and a kitchen that had done its time.

None of that is a structural problem, and it is worth saying so plainly: paint is cheap to change. What made this a proper refurbishment rather than a redecoration was what sat behind it.

CHAPTER02

What we did

The house came back to bare brick where it needed to, and everything soft came out: paper, plaster, carpets, kitchen.

With the walls open we rewired the property in full, including a new consumer unit, because the existing installation was not something to hand a tenant. Woodworm turned up in timber during the strip-out, which is exactly what a contingency is for on a buy-to-let, and it was treated rather than covered over.

Then back up: replastered throughout, new kitchen, new boiler, new internal and front doors, decorated and carpeted.

CHAPTER03

What changed

It went from a property that would have needed a tenant with imagination to one that lets on its condition. White walls, clean carpet, a kitchen that works and an electrical installation nobody has to worry about.

That is the whole argument for doing a buy to let refurbishment properly in one run rather than in instalments between tenancies. The disruption happens once, while the property is empty and earning nothing, instead of repeatedly while somebody is living in it.

↳ 04 The build, stage by stage
04Project · Stages
04 / 07

Refurbishment · Stoke-on-Trent

From back-to-brick to handover.

A buy to let refurbishment in Stoke-on-Trent, taken on for a landlord who wanted the property turned round and let rather than lived in. Full strip-out, rewire, replaster, new kitchen and boiler, then decorated and carpeted throughout. The kind of property refurbishment that decides whether a buy-to-let works as an investment or becomes a running repair job.

Stage 01 / 04Before

How we found it

Heavily decorated, dated, and tired rather than derelict. A red lounge, a painted feature wall, brick-effect paper and an old kitchen.

On a buy-to-let the temptation here is to paint over it and put it on the market. That works right up until the first tenant reports something, and then you are doing the job anyway with somebody living in the house.

9 images

Before · red painted lounge with a fake brick chimney breast
Before · brick-effect wallpaper in the back room
Before · blue geometric feature wall painted onto plaster
Before · the original kitchen
Before · the property as bought
Before · the property as bought
Before · the property as bought
Before · the property as bought
Before · the property as bought
Stage 02 / 04Strip-out

Back to brick, and rewired

Plaster, paper, carpets and kitchen out. Where the walls needed to come back to brick, they did.

With the house open we put in a full rewire and a new consumer unit. This is the stage that never appears in a finished-property photograph and is the reason the refurbishment was worth doing: nobody buys a rental for the wiring, and everybody inherits it.

15 images

Strip-out · back room taken back to brick
Strip-out · new consumer unit and meter board on bare brick
Strip-out · first fix cabling run through the house
Strip-out · chased walls ready for plaster
Strip-out · the property mid-refurbishment
Strip-out · the property mid-refurbishment
Strip-out · the property mid-refurbishment
Strip-out · the property mid-refurbishment
Strip-out · the property mid-refurbishment
Strip-out · the property mid-refurbishment
Strip-out · the property mid-refurbishment
Strip-out · the property mid-refurbishment
Strip-out · the property mid-refurbishment
Strip-out · the property mid-refurbishment
Strip-out · the property mid-refurbishment
Stage 03 / 0475%

Plaster, kitchen and boiler

Replastered throughout, then the kitchen and boiler in.

This is the point on a refurbishment where it stops looking like a building site and starts looking like a house again, and it is also the point where rushing costs you. Plaster gets its drying time before anything goes on it.

8 images

75% · freshly plastered walls drying out
75% · new kitchen units going in
75% · new boiler fitted
75% · kitchen worktops and appliances being installed
75% · kitchen worktops and appliances being installed
75% · kitchen worktops and appliances being installed
75% · kitchen worktops and appliances being installed
75% · kitchen worktops and appliances being installed
Stage 04 / 04Complete

Ready to let

Decorated, carpeted, new internal doors and a new front door.

Deliberately plain. A rental wants to be clean, neutral and hard to damage, not styled. Every surface in here is one a landlord can touch up between tenancies without matching somebody else’s taste.

12 images

Complete · lounge decorated and carpeted with the new front door
Complete · bedroom finished in neutral decoration
Complete · second bedroom with new radiator
Complete · finished room ready for tenants
Complete · finished room ready for tenants
Complete · finished room ready for tenants
Complete · finished room ready for tenants
Complete · finished room ready for tenants
Complete · finished room ready for tenants
Complete · finished room ready for tenants
Complete · finished room ready for tenants
Complete · finished room ready for tenants
↳ 05 Client word
06Project · On Camera
06 / 07

On camera · Watch the build

On camera.

Every HYPE build is documented on camera. The videos from this project sit at the top. Below them: three of John’s most-watched videos from HypeTV.

More from HypeTV

↳ 07 Next step

More builds like this

House Extensions & Refurbishment · Burslem, Stoke-on-Trent

Back to brick refurbishment in Burslem, Stoke-on-Trent

HYPE Building worked with an experienced property investor to bring a 3-storey 4-bed end terrace back to life. Originally planned as a buy-to-let, the scale of hidden damage forced the decision to go fully back to brick: which then unlocked the option of a 5-bed all-en-suite HMO.

House Extensions & Refurbishment · Stoke-on-Trent

Bungalow flip in Stoke-on-Trent · open-plan kitchen-lounge transformation

House flipping is buying low, renovating, selling high: fast. According to BestHeating's UK Flipping Hot Spots Report, Stoke-on-Trent ranks 4th nationally for flipping returns, behind only Manchester, Nottingham and Liverpool. This Stoke-on-Trent bungalow flip has a twist: the owner isn't buying it, they already own it. They're renovating fast, knocking through to create an open-plan kitchen-lounge with island plus a generously-sized conservatory, and timing the sale to the current market. HYPE delivered the build to the wow-factor finish a flip needs to compete.

Local Authority Work · Caverswall, Stoke-on-Trent

2-bed bungalow renovation, Caverswall · local authority refurb

A local-authority-owned 2-bed bungalow on the outskirts of Caverswall, tired and overdue for refurbishment. HYPE took it from poor-condition to tenant-ready: new roof, brickwork repaired at the gable end, asbestos drainpipe safely removed under non-licensed protocols, lean-to demolished, new central heating, full rewire, walls re-skimmed, new joinery, full driveway and garden overhaul, plus a new wet room with disabled access. The build is shown through the 5-part HypeTV series rather than photography: and the case study is also where we share what neighbours said about the team. Including Nancy, who took a bad fall during the build and was helped by our Site Manager Dan.

07Project · Next Step
07 / 07

Get in touch. Honest answer. No hard sell.